Magnum-venus-plastech Quick Shot Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Magnum-venus-plastech Quick Shot. Magnum Venus Plastech Quick Shot User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - Quick Shot Operations

Rev. 03/2013 Quick Shot Operations Manual

Page 2 - MVP Plastech UK

Quick Shot Operations Manual Rev. 03/2013 Page | 10 D. Never add MEKP to anything that is hot, since explosive decomposition may result. E. Avoid co

Page 3 - TABLE OF CONTENTS:

Quick Shot Operations Manual Rev. 03/2013 Page | 11 A. The reaction is unpredictable. Prior use of an HHC solvent without incident (corrosion or exp

Page 4 - Rev. 02/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 12 2.4 Catalyst Diluents Magnum Venus Plastech spray-up and gel-coat systems currently produced are

Page 5 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 13 2.8 Treatment of Chemical Injuries Great care should be used in handling the chemicals (resins,

Page 6

Quick Shot Operations Manual Rev. 03/2013 Page | 14 3.0 Equipment Safety WARNING Magnum Venus Plastech suggests that personal safety equipment such

Page 7 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 15 3.2 Grounding Grounding an object means providing an adequate path for the flow of the electrica

Page 8 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 16 Introduction: A state-of-the-art, easy-to-use pail dispensing system designed for the fiber rei

Page 9 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 17 SPECIFICATIONS: Output: 4 to 8 lb. (1.8 to 3.5 kg) per min. Catalyst %: 1% to 2.5% by vo

Page 10 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 18 Getting Started: Warning: before preforming any operations on the Quick Shot be sure read and f

Page 11 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 19 Quick Start Instructions: 1. Prime resin pump 2. Adjust the catalyst percentage 3. Prime Cat

Page 12 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 2 CORPORATE HEADQUARTERS and MANUFACTURING 11692 5

Page 13 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 20 Hose Connections: 1. Resin Hose – connect the resin hose from the pump to resin valve on the d

Page 14 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 21 Operating Procedures: 1. Move the catalyst pump to the desired catalyst percentage as noted on

Page 15

Quick Shot Operations Manual Rev. 03/2013 Page | 22 Priming Procedures: With the hoses connected as stated above: 1. Fill the catalyst jug with a

Page 16 - Introduction:

Quick Shot Operations Manual Rev. 03/2013 Page | 23 Shut Down Procedures: TO SHUT THE UNIT DOWN OVERNIGHT: 1. Turn the regulator knob counter-clo

Page 17

Quick Shot Operations Manual Rev. 03/2013 Page | 24 Troubleshooting: Caution: Before attempting to disassemble any portion of catalyst or resin sys

Page 18 - Getting Started:

Quick Shot Operations Manual Rev. 03/2013 Page | 25 PUMP CALIBRATION - Note: If you would like to check out the ratio output between the resin and

Page 19 - Quick Start Instructions:

Quick Shot Operations Manual Rev. 03/2013 Page | 26 Component Manuals: Pump / Fluid Section Manual: The Quick Shot comes standard with the VPRO-45

Page 20 - Hose Connections:

Quick Shot Operations Manual Rev. 03/2013 Page | 27 Parts Drawings: QS-FM-PRO-11 Quick Shot Assembly VPRO-45110-QS 11:1 Pro Pump Assembly – Qui

Page 21 - Operating Procedures:

Quick Shot Operations Manual Rev. 03/2013 Page | 28

Page 22 - Priming Procedures:

Quick Shot Operations Manual Rev. 03/2013 Page | 29

Page 23 - Shut Down Procedures:

Quick Shot Operations Manual Rev. 03/2013 Page | 3 TABLE OF CONTENTS: SECTION: Page TERMS & CONDITIONS

Page 24 - Troubleshooting:

Quick Shot Operations Manual Rev. 03/2013 Page | 30

Page 25

Quick Shot Operations Manual Rev. 03/2013 Page | 31

Page 26 - Component Manuals:

Quick Shot Operations Manual Rev. 03/2013 Page | 32

Page 27 - Parts Drawings:

Quick Shot Operations Manual Rev. 03/2013 Page | 33

Page 28 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 34

Page 29

Quick Shot Operations Manual Rev. 03/2013 Page | 35

Page 30 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 36

Page 31

Quick Shot Operations Manual Rev. 03/2013 Page | 37

Page 32

Quick Shot Operations Manual Rev. 03/2013 Page | 38

Page 33

Quick Shot Operations Manual Rev. 03/2013 Page | 39

Page 34

Quick Shot Operations Manual Rev. 02/2013 Page | 4 Terms & Conditions of Sale: 1. ACCEPTANCE: Acceptance of any purchase order from a customer

Page 35

Quick Shot Operations Manual Rev. 03/2013 Page | 40

Page 36 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 41 Revision Information: Revision: Description: Rev. 03/2013 Updated the drawings and the “T

Page 37 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 42 MAGNUM VENUS PLASTECH CORPORATE HEADQUARTERS and MANUFACTURING 11692 56th Court * Clea

Page 38 - Rev. 03/2013 Page

Quick Shot Operations Manual Rev. 03/2013 Page | 5 13. EXCUSABLE DELAYS: Seller shall have no liability if its performance is delayed or prevented b

Page 39

Quick Shot Operations Manual Rev. 03/2013 Page | 6 22. JURISDICTION AND VENUE: The parties hereby irrevocably submit to the jurisdiction of the sta

Page 40

Quick Shot Operations Manual Rev. 03/2013 Page | 7 SAFETY & WARNING INFORMATION: OPERATING YOUR POLYESTER SYSTEM SAFELY 1. Introduction Any tool

Page 41 - Revision Information:

Quick Shot Operations Manual Rev. 03/2013 Page | 8 Extinguishing Media – Foam, Carbon Dioxide, Dry Chemical, Water Fog. Copies of the above bulletin

Page 42 - MAGNUM VENUS PLASTECH

Quick Shot Operations Manual Rev. 03/2013 Page | 9 2.2 Catalyst (Methyl Ethyl Ketone Peroxide) MEKP is among the more hazardous materials found in c

Commentaires sur ces manuels

Pas de commentaire